You are here: Home / News / Dry Mix

Dry Mix

  • 2021-02-21

    Pay attention to the influence of temperature on tile adhesive During winter construction
    As we all know, tile glue is generally made of cement and mixed with various additives. It is mixed and stirred with water on the construction site during use, and then applied to the wall or floor. Generally, it has a certain initial strength about 12 hours after construction. As time goes by, the
  • 2018-07-30

    How to calculate the consumption of dry powder putty?
    Theoretical consumption: 0.8 ~ 1 kg / square meter (batch scrap thickness 0.5mm ~ 1mm, once) dry powder putty dosage = theoretical consumption × batch scraping putty area batch putty area = room building area × (2.5 ~ 3)5When the putty is scraped, why should the construction temperature be above 5 °
  • 2018-06-30

    How is the cracking of the putty layer caused? What should I do?
    Hebei Derek Chemical Limited. Is located in the southeast of the provincial capital shijiazhuang, Hebei province, China.Our company main products: hydroxypropyl methyl cellulose,
  • 2018-04-30

    How is the putty layer foaming and empty drums, how should it be handled?
    The main reason is that the putty layer is hollowed and foamed. The main reason is that there is gas between the base layer and the putty layer, and why the air does not diffuse into the normal layer and diffuse into the base layer, but appears in the middle. The main reasons are as follows: : improper treatment of the base layer, so that the contact between the putty layer and the base layer is not tight enough to form an interlayer; there is a dense layer between the base layer and the putty layer, such as interface agent or wall solid without water for interface treatment, so that the air cannot diffuse normally to the base layer. Solution: If the wall bubble or empty drum is small, it can be treated by sanding and then treated with wall solidification, and then scraped; if the wall is large, it has caused large area to fall off, it is recommended to use all the walls after eradication. Solid treatment, then batch scraping.
  • Total 23 pages  Go to Page
  • Go
Copyright © 2018 Hebei Derek Chemical Limited. All Rights Reserved.
Home
   0086-311-68073226        0086-17731108068           sales@derekchem.com            No.86 Guangming Street, Nancun Town, Chang’an District, Shijiazhuang, China